Add up the load, plan for headroom and pick the backup time. Here is the method our engineers use on every site survey.

Short answerAdd the running watts of every device on the UPS, divide by the power factor to get VA, then add 20–25% headroom. Backup time is set by the battery bank, not the UPS rating.

Most UPS problems we are called to fix come from one mistake: the unit was sized from a guess. An undersized UPS trips on startup surges. An oversized one wastes money and runs inefficiently. Four steps get it right.

1. List everything the UPS will carry

Write down each device and its running power in watts. The number is on the rating label or in the manual. Only include loads that must stay on during an outage. Air conditioners and water heaters usually belong on a generator instead.

2. Convert watts to VA

UPS units are rated in VA (volt-amperes). Divide the total watts by the load’s power factor. For mixed IT and office loads, our engineers commonly assume 0.8 unless the equipment states otherwise.

VA = Total watts ÷ power factor

3. Add 20–25% headroom

Headroom covers inrush current, future equipment and keeps the UPS out of its stressed upper range, which extends battery and component life.

4. Decide the backup time

The UPS rating decides how much load it can carry. The battery bank decides how long. Tell us whether you need ten minutes to shut down safely or several hours to ride through load-shedding, and we size the batteries to match.

Worked example

Device Running watts
10 desktop PCs [ ] W
Network rack [ ] W
CCTV recorder + cameras [ ] W
Total [ ] W → [ ] VA → choose [ ] kVA

Frequently asked questions

Can I run an air conditioner on an online UPS?

It is possible with a large enough unit, but it is rarely cost-effective. Compressor startup current needs a much bigger UPS and battery bank.

Does a bigger UPS give longer backup?

Not by itself. Backup time depends on battery capacity. A bigger UPS with the same batteries gives about the same runtime.

Single-phase or three-phase?

It depends on your supply and load size. Larger installations usually use three-phase units. Our engineer confirms this during the survey.

Not sure about your numbers? Book a Service and our engineer will measure the real load on site.

A
admin@2026@ About Amecon

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top